Print
Press Enter to show all options, press Tab go to next option
Homepage Banner

WELCOME to the Littleton/Englewood Wastewater Treatment Plant (L/EWWTP) Engineering and Maintenance website. Our Division consists of 20 full time employees, dedicated to providing high quality repairs and intensive preventive maintenance on over 2500 pieces of equipment. As a Division, we support the mission of the L/EWWTP by providing technical expertise in the areas of Engineering and Maintenance of wastewater transmission and treatment facilities. By attaining high levels of equipment reliability and service availability, the Plant is able to treat up to 50 million gallons of wastewater each day. Additionally, the Plant’s 50-acres of grounds are maintained to park-like standards.

Mission:
To provide reliable infrastructure that supports the L/E WWTP Management Objectives.

Vision:
We will be recognized as leader in the wastewater industry.

Values:
Respect
Teamwork
Collaborative Ownership
Innovation
Professional Development

Objectives:
Manage the design, implementation, and construction of capital projects, physical improvements, and maintenance programs.

Maintain plant systems and equipment at a high level of reliability.

Manage facility physical assets through infrastructure stabilization – high quality repairs and intensive preventive maintenance to attain high levels of reliability and service availability.

Provide responsive and cost effective services.

Provide a clean and attractive plant and efficiency of services.

Maintain safe working conditions for all L/E WWTP employees.

Maintain a well-trained and productive staff.


Our Division is classified into three departments:
Engineering  /  Maintenance - Process  /  Maintenance - Facilities  /  Contacts